Project Description

Construction of reinforced cast-in-place concrete bridge abutments on steel piles, 42 meter steel girders and cast in place bridge deck, in addition removal of 66,000 tonne of excavated material, 15,000 M3 of Rip Rap placement and approx. 1.5 Km of new highway construction. Scope included supply and install two lanes 40 meter long temporary bridge, project located 40 km West of Chetwynd, British Columbia.

ClientMinistry of Transportation
DateNov 2018
Value$4,900,000