Project Description

Members of our team were responsible for all foundation and substructures work which encompasses 8 cofferdams with a total concrete volume of 5000 m3 followed by a conventional spread footing piers with a total concrete volume of 2000 m3 as well as steel superstructure construction. The bridge will span over the Mackenzie River in the Northwest Territories. In order to construct the piers, a temporary access bridge was built.

Project TypeBridges and Infrastructure